b

Ambulatory Care Center& Haemodialysis Clinic, Hospital Raja Perempuan Zainab II

Client               : Kementerian Kesihatan Malaysia
Location           : Kota Bharu, Kelantan                           
Year                 : 2008
Cost                 : RM115mil

EAG advised on energy benchmarking target and strategies for operational energy savings. The simulation is done for the whole year energy consumption with several zoning and diversity. The result will be submitted to JKR as their references for decision making on the implementation of the Energy Efficiency features. The simulation is done for the whole year energy consumption with several zoning and diversity. The aim was to conduct a series of parametric studies, analyzing a range of passive and active systems in order to achieve the target Building Energy Index (BEI).